Ore Enrichment Gold+silver 90% High Product-10 Tons per hour
year
WE REQUEST 2 MILLION EURO, EXCLUDING INSTALLATION AND ASSEMBLY, TO SEPARATE GOLD OR SILVER FROM 10 TONS HOUR HOUR AND TURN IT INTO INGOT. WE PROMISE TO MAKE THE METAL ORDER WITH THE LEACH PROCESS, SO SOIL+WATER+CYANIDE (WE WILL USE 1KG OF CYANIDE FOR 1000KG OF SHEMALE). 1- Transport vehicles to this production line are NOT included in the price 2- BUSINESS MACHINES ARE NOT INCLUDED IN THE PRICE. 3- CRUSHERS, ie BALL MILLS THAT GRIND THE PRODUCT TO 1-25 MICROMETER, ARE NOT INCLUDED. 4-THE WORKING PRODUCT, THAT is, MINING ENERGY, WILL BE DISCHARGED TO THE ENTRY OF THE CUSTOMER'S LEAKING TANK. THEN THE FACILITY WILL REMOVE THE VALUABLE MINE (GOLD+SILVER) FROM THE SOIL AND TURN IT INTO INTO. WITH MINIMUM 80% -------- MAXIMUM 90% EFFICIENCY, VALUABLE METAL CIRCLE WILL BE RECOVERED FROM THE SOIL.